Hi,
I have pushed series of patches related to ARQ-2 support for EGPRS DL Retransmission. This patches have been reviewed earlier and comments have been Addressed. These patches are tested and validated with NuRAN 1.0 hardware.
Below are the links to Gerrit review of each patches along with patch description.
1) https://gerrit.osmocom.org/#/c/332/ ==>Add data structure for ARQ-II in EGPRS DL.
2) https://gerrit.osmocom.org/#/c/333/ ==>Add Accessor functions for ARQ-II in EGPRS DL.
3) https://gerrit.osmocom.org/#/c/334/ ==>Modify DL tbf flow for ARQ-II in EGPRS DL Retx.
4) https://gerrit.osmocom.org/#/c/335/ ==>Add test cases to support ARQ-II for EGPRS DL Retx.
Above patches must be merged to master in the same order as mentioned above.
Thanks, Aravind Sirsikar
On Mon, Jun 20, 2016 at 09:05:30AM +0000, Aravind Sirsikar wrote:
https://gerrit.osmocom.org/#/c/332/ ==>Add data structure for ARQ-II in EGPRS DL.
https://gerrit.osmocom.org/#/c/333/ ==>Add Accessor functions for ARQ-II in EGPRS DL.
https://gerrit.osmocom.org/#/c/334/ ==>Modify DL tbf flow for ARQ-II in EGPRS DL Retx.
https://gerrit.osmocom.org/#/c/335/ ==>Add test cases to support ARQ-II for EGPRS DL Retx.
Above patches must be merged to master in the same order as mentioned above.
As mentioned before, we're now on the Rebase-If-Necessary strategy in gerrit, which ensures the correct ordering. You will notice here https://gerrit.osmocom.org/#/c/335/1 that on the right, there is a list of "Submitted Together", which shows me that you have committed as expected, from a branch all at once.
It would have sufficed to just link to the last submission (335), or actually, there is no need to comment at all. Next time you can just submit to gerrit and you're done :)
(Strangely enough, the "submitted together" list always shows only the preceding commits in a series, while the "related changes" always shows all of them.)
~Neels
osmocom-net-gprs@lists.osmocom.org