2013/10/28 Holger Hans Peter Freyther <hfreyther(a)sysmocom.de>de>:
I don't have a log file but with the routing area
update, the
SGSN may assign a new P-TMSI and if a new P-TMSI was assigned
with the "Accept" message, a "Complete" message needs to be
generated by the MS. This message can/should already contain
the new TLLI (which is derived from the P-TMSI).
Ok, I will try to reproduce it.
--
Regards,
Ivan Kluchnikov.
http://fairwaves.ru