HAR2009 TODO list (MS power, BS-11 calibration)

This is merely a historical archive of years 2008-2021, before the migration to mailman3.

A maintained and still updated list archive can be found at https://lists.osmocom.org/hyperkitty/list/OpenBSC@lists.osmocom.org/.

Dieter Spaar spaar at mirider.augusta.de
Tue Aug 4 11:24:21 UTC 2009


Hello Harald,

On Tue, 4 Aug 2009 10:18:55 +0200, "Harald Welte" <laforge at gnumonks.org> wrote:
> 
> Status update: I have now hard-coded a MS power limit of 20dBm (100mW) for all
> activated channels.  The BS-11 still doesn't use dynamic MS power control
> yet, but that is optional anyway.  At least we're sure the MS now get told to
> use no more than 100mW to talk to the BTS.

If you not already modified it, please don't forget to adjust the "Cell
Selection Parameters" in System Information 3 and 4. The GIT version
from a few days ago still sets MS-TXPWR-MAX-CCH to the maximum. This
means that the power of the initial RACH burst is too high although
the channel power gets properly adjusted later.

Best regards,
  Dieter
-- 
Dieter Spaar, Germany                           spaar at mirider.augusta.de




More information about the OpenBSC mailing list