This is an automated email from the git hooks/post-receive script. It was
generated because a ref change was pushed to the repository containing
the project "Osmocom BTS-side code (Abis, scheduling, ...)".
The branch, master has been updated
via c265bef48c414ca6c135f803c0c5dfdecbeece72 (commit)
via 02a2afa962799c1519eb78cffa8877fd3da75b2e (commit)
via ffc193443c177c3e41851c445c71fc1095ae2201 (commit)
from 8968b48643686683046a0af403178960f8baf9ed (commit)
Those revisions listed above that are new to this repository have
not appeared on any other notification email; so we list those
revisions in full, below.
- Log -----------------------------------------------------------------
http://cgit.osmocom.org/osmo-bts/commit/?id=c265bef48c414ca6c135f803c0c5dfd…
commit c265bef48c414ca6c135f803c0c5dfdecbeece72
Author: Holger Hans Peter Freyther <holger(a)moiji-mobile.com>
Date: Tue Dec 16 20:20:27 2014 +0100
sysmobts: Add slave on/off action for the sysmoBTS2050
Add new power actions for the sysmoBTS2050. This allows to
switch off the secondary/slave when the system temperature
is too high and back on when the normal level is reached.
Do not allow to switch off the master (so remove the enum
value), do not check if the slave is switching itself off.
http://cgit.osmocom.org/osmo-bts/commit/?id=02a2afa962799c1519eb78cffa8877f…
commit 02a2afa962799c1519eb78cffa8877fd3da75b2e
Author: Holger Hans Peter Freyther <holger(a)moiji-mobile.com>
Date: Tue Dec 16 19:09:30 2014 +0100
sysmobts: Comment out the varpoware options that are not implemented
http://cgit.osmocom.org/osmo-bts/commit/?id=ffc193443c177c3e41851c445c71fc1…
commit ffc193443c177c3e41851c445c71fc1095ae2201
Author: Holger Hans Peter Freyther <holger(a)moiji-mobile.com>
Date: Tue Dec 16 18:26:35 2014 +0100
sysmobts: Add "normal" actions to execute
Instead of keeping state to remember what was done and needs
to be undone this patch introduces actions that will be executed
when the system is back to normal.
By design the system is considered to be in the normal state
and these actions will be only executed after the system is
coming back to the normal state.
One advantage of this scheme is that an operator can decide
that an overheated systems hould be off duty and requires manual
interaction to be allowed back in service.
The change has only been smoke tested
Fixes: SYS#833
-----------------------------------------------------------------------
Summary of changes:
src/osmo-bts-sysmo/misc/sysmobts_mgr.h | 15 +++-
src/osmo-bts-sysmo/misc/sysmobts_mgr_2050.c | 20 +++++
src/osmo-bts-sysmo/misc/sysmobts_mgr_temp.c | 70 +++++++++++++---
src/osmo-bts-sysmo/misc/sysmobts_mgr_vty.c | 122 ++++++++++++++++++++++++++--
src/osmo-bts-sysmo/misc/sysmobts_misc.h | 1 +
5 files changed, 211 insertions(+), 17 deletions(-)
hooks/post-receive
--
Osmocom BTS-side code (Abis, scheduling, ...)