This is merely a historical archive of years 2008-2021, before the migration to mailman3.
A maintained and still updated list archive can be found at https://lists.osmocom.org/hyperkitty/list/osmocom-commitlog@lists.osmocom.org/.
gitosis at osmocom.org gitosis at osmocom.orgThis is an automated email from the git hooks/post-receive script. It was generated because a ref change was pushed to the repository containing the project "Osmocom BTS-side code (Abis, scheduling, ...)". The branch, master has been updated via 9a2187e7b19cd940007df724a5343003f847799f (commit) from 65db0f5c418841ead1e9b11c0194798edeebaa1a (commit) Those revisions listed above that are new to this repository have not appeared on any other notification email; so we list those revisions in full, below. - Log ----------------------------------------------------------------- http://cgit.osmocom.org/osmo-bts/commit/?id=9a2187e7b19cd940007df724a5343003f847799f commit 9a2187e7b19cd940007df724a5343003f847799f Author: Philipp Maier <pmaier at sysmocom.de> Date: Mon Jul 10 12:54:57 2017 +0200 octphy: remap frame number in MEAS_IND The octasic phy stamps the SACCH channel that carries the measurmenet indication with the frame number of the last SACCH that falls within the measurement period. The higher layers expect the frame number to be aligned to the SACCH channel after, which marks also the beginning of the next measurement period. Make the octphy code compatible to the higher layers by remapping the measurement indication frame number. Change-Id: I8ecb27c018bf4ad5151878a6ad34026fd0f801a1 ----------------------------------------------------------------------- Summary of changes: src/osmo-bts-octphy/l1_if.c | 53 ++++++++++++++++++++++++++++++++++++++++++++- 1 file changed, 52 insertions(+), 1 deletion(-) hooks/post-receive -- Osmocom BTS-side code (Abis, scheduling, ...)